Monday was another busy day at the library construction site. Framing crew is working inside, more roofing material was delivered, and the crew on the roof is laying tar paper in preparation for shingles. We met with Tom the electrician to finalize outlet, port and switch plans. All interior and exterior materials have been selected. We're growing accustomed to the mud. The photo above shows the addition of the covered walkway at the main entrance on the east side of the building.
(Photo by Terry Davis, J.W. Elmer Construction)